Why Matrix ?

1. One Window Operation   2. ISO 9001:2015 certified Company 3. Manufacturing with modern Machine Tools 4. Timely deliveries and safely completion 5. Manufacturing through latest Engineering techniques 6. Experienced and qualified personnel 7. Following International Standards 8. Manufacturing experience covering almost every Process industry 9. Quality Management Systems for QA/QC

1. UMAG Technologies Gmbh-Germany

Installation, Erection and Commissioning of 3 No. Heat Recovery Boilers of capacity 50 TPH each @ 40 Bar(g) pressure & 400oC superheated steam coupled with 3 No. Gas Turbines of 10 MW each including associated Equipment, High Pressure Pumps, ID / FD Fans, Economisers, Super Heaters, Steam Drums, Ducts & Stacks at Pak-Arab Fertilizers Limited, Multan.

Project Includes;

2. Hamza Sugar Mills Ltd.

Installation, Erection and Commissioning of Baggase / Coal Fired Boiler of capacity 100 TPH @ 90 Bar(g) pressure & 540oC superheated steam coupled with 10 MW Steam Turbine including associated Equipment, High Pressure Pumps, ID / FD Fans, Economiser, Super Heater, Steam Drum, Ducts & Stacks at Hamza Sugar Mills Ltd. Khanpur.

Project Includes;

3. ICI Pakistan Ltd.

Installation, Erection and Commissioning of 2 No. HTM Heaters of capacity 9,500 KW each @ 2.2 MPa pressure & 377oC Temperature including associated Equipment, High Pressure Pumps, High Pressure Piping, ID & FD Fans, Vessels, Tanks, Pre-Heaters, Condensers, Coal Crusher, Dust Collectors, Ducts, Stacks, Conveyors & Steel Structure etc. at ICI Polyester Plant, Sheikhupura.

Project Includes;

4. Unilever Pakistan Ltd.

Expansion Projects at Walls Ice Cream Factory includes:

Expansion Projects at HPC – RYK Factory includes:

Expansion Projects at Unilever Pakistan Foods Ltd. includes;

5. The Coca Cola Export Corporation of Pakistan

6. Pepsi Cola International (Pvt.) Ltd.

7. Engro Foods Ltd. (Dairy & Ice Cream Plants).

8. Mondelez Pakistan Ltd.

Design, Fabrication, Installation and Commissioning of Chocolate Conveying System includes;

9. Procter & Gamble Pakistan (Pvt.) Ltd.

Capacity Enhancement of Dry Laundry Powder Plant (PQ Ci-8 Project);

Installation and Commissioning of 60,000 MSU Shampoo Plant (Shaheen Project);

10. Qarshi Industries (Pvt.) Ltd.