.

Why Matrix Engineering?

  • Composite Solution Provider with "One Window Operation";
  • Maufacturing experience covering almost every Process industry;
  • Manufacturing with modern Machine Tools;
  • Timely deliveries and completion;
  • Manufacturing through latest techniques;
  • Experienced and qualified personnel;
  • Following Internatinol Standards;
  • ISO 9001:2015 certified Company;
  • Quality Management Systems for QA/QC;
HomeManufacturing

Matrix Engineering has its own manufacturing facility spread over an area of 10,000 M2, located in Sundar Industrial Estate Lahore, Pakistan. Manufacturing facility is equipped with all kind of Tools, Plant & Machinery to cater heavy and light manufacturing in a wide range of materials including Carbon Steel, Stainless Steel and Alloy Steel. All kind of lifting Tools & Equipment including mobile cranes, overhead cranes, fork lifters and pallet trucks for safe handling of jobs are also available at our manufacturing facility. Skilled manpower adopts the engineering design to finished products with the help of allocated resources under the supervision of experienced management.

Following activities are carried out at our manufacturing facility;

  • Plate Rolling
  • Plate Bending
  • Dish End Forming
  • Orbital Welding
  • Manual Welding
  • Automatic Welding
  • Pipe Bending & Rolling
  • Tube Bending & Rolling
  • Section Bending & Rolling
  • Plasma Cutting
  • Automatic Gas Cutting
  • Machining & Drilling
  • Cladding & Weld Overlays
  • Pressure & Vacuum Testing
  • Polishing & Passivation
  • Sandblasting & Painting
  • Electrification & Instrumentation
  • Inspection & Testing

Production Planning & Control department plays vital role for timely completion and delivery of jobs. They prepare & implement production plans, closely monitor these plans and take necessary measures to remove bottlenecks by allocating more resources if required.

Finally these plans are analyzed by comparing budgeted man-hours, materials & consumables against actual consumed as a part of continual improvement.

 

Achievements:

The Company has achieved following milestones for the provision of EPC Services to our valuable customers up till now;

 

  • Fabrication of Equipment in CS and SS materials
:      800 Tons (Approx.)
 
  • Fabrication and Erection of Steel Structure in CS and SS materials
:      3,000 Tons (Approx.)
 
  • Installation and Erection of Plant Equipment & Machinery
:      4,500 Tons (Approx.)

 
  • Pipeline Fabrication and Installation in CS and SS materials 
    (High Pressure and Hygienic Class Piping)
:
 
 180,000 Dia. Inches 
 

 

Click images below to open Album